I. |
Area of land allotted (in acres)
Whether land transferred in the Name of Samiti
Vidyalaya shifted to permanent buildings on |
: 30 Acres
: Yes
: |
ii. |
Status of Boundary Wall
a. Brick Wall
b. Barbed wire fencing |
: Completed
Brick wall |
iii. |
Permanent buildings constructed |
: CBRI pattern |
iv. |
School building |
: Complete
Shortage of Class rooms and Spaceship Rooms |
v. |
Dormitories |
: Boys 1.25 Nos.
With Warden Residence 02 Nos. |
|
|
: Girls .75 Nos.
with Warden Residence 02 Nos. |
vi. |
Kitchen/dining Hall
No. of shifts required for all students to take food |
: Complete
One Shift |
vii. |
Principal Residence
|
: 01 No. |
viii. |
Staff Quarters
|
: Type III = 24 Nos.
Type II = 02 Nos.
Type I = 06 Nos.
SP Sheds converted into Staff Qrs.: NIL Nos. |
ix. |
M.P. Hall |
: Available |
x. |
Workshop |
: Available |
xi. |
Type of O.H. Tank
Its capacity
Present Status |
: Column based
: litres
: Working satisfactory |
xii. |
U.G. tank
Its capacity
Present Status |
: NIL litres
: Working satisfactory |
xiii. |
D.G. Set
|
: Available:
: Kirloskar make
: 10 KVA
: Working
: Year of procurement |
xiv. |
Sewage Pump |
: NIL |
xv. |
Water Pump
|
: Submersible Moter Pump
7.5 capacity |
xvi. |
Electrification
Electric connection
Sub Station building
Street lighting
Numbers of hrs. During day when power supply is available on an average. |
: Rural
: Complete/ Incomplete
: 34 Nos. of Poles
: 3- 4 hrs.
|
- |
Playfields
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
|
: Available/ not available
: _______Nos. – Available / not available
: _______Nos. – Available / not available |
xviii. |
Water supply
Tube Well
Hand pump
Connection from PHED
|
: Potable, ______ Nos.- working
: Potable, ______ Nos.- working / not working
: ______ hours supply in a day |
xix. |
Rajiv Gandhi Smriti Van
|
: Available |
xx. |
Fire fighting arrangement
|
: Working |
xxi. |
Last date of cleaning of
- Septic tank
- Water tanks
|
:
: |
xxii. |
Whether area around transformer is fenced
|
: Yes |
xxiii. |
Whether open wells, if any, are covered from top |
: Yes |
xxiv. |
Works taken up under M&R fund during current year and last year:- |
: |
Year |
Name of work (M&R) |
Expenditure
(Rs. In lacs) |
Cumulative expenditure during the year |
- |
- |
- |
- |